Inspection & Test
Owned by quality rather than production: optical and X-ray inspection, metal detection, checkweighing, coordinate measurement, leak and functional test. On an electronics or aerospace line this can be a third of the floor, and none of it makes product.
14 types, and what a survey records
| Equipment type | Recorded for each one |
|---|---|
| AOI / Optical Inspection | Stage · Inline or offline |
| X-ray Inspection | Max sample size · Imaging · Tube voltage · Tube hours / expected life · Radiation protection · What happens on failure |
| ICT / Flying Probe Test | Type · Test time per board · Fixtures held · Test coverage · Calibration / verification interval · What happens on failure |
| Burn-in / Environmental Chamber | Chamber volume · Temperature range · Humidity range · Capability · Calibration / verification interval · Refrigeration service interval |
| Metal Detector / X-ray Inspection | Type · Aperture size · Sensitivity · Test piece checks · Reject verification · What happens on failure |
| Checkweigher | Weight range · Accuracy · Packs per minute · Legal for trade / average weight · Calibration / verification interval · Feedback to filler |
| CMM / Inspection Machine | Measuring volume · Accuracy / MPE · Probe · Environment · Calibration / verification interval · Programs held |
| SPI / Solder Paste Inspection | Max board size · Resolution · Cycle time · Feedback to printer · What happens on failure |
| Functional Test (FCT) | Test time per unit · Fixtures held · Functional coverage · Results logged · Calibration / verification interval · What happens on failure |
| Transformer / Motor Test Rig | Max rating tested · Test voltage · Tests performed · Calibration / verification interval · Safety interlocks |
| Leak Test Rig | Method · Detectable leak rate · Test pressure · Cycle time · Calibration / verification interval · Master / calibrated leak used |
| Test Rig / Dynamometer | Max power absorbed · Max speed · Max torque · Absorber · Energy regenerated to site · Calibration / verification interval |
| Vision Inspection System | Cameras · Resolution / smallest defect · Parts per minute · False reject rate · Lighting · What happens on failure |
| NDT / Ultrasonic Inspection | Method · Standards worked to · Operator qualification · Calibration / verification interval · Reference blocks / calibration pieces |
Anything not listed is recorded under “Other Inspection & Test” — no list of industrial equipment is ever finished, and a register that pretends otherwise forces people to pick something untrue.
Other categories
Production · Surface Finishing & Treatment · Packaging & Labelling · Materials Handling · Process Heat · HVAC & Refrigeration · Ventilation & Extraction · Compressed Air · Electrical Distribution · Water & Effluent · Utilities · Controls & Automation · Lighting · Sensors / Instrumentation